The following projects are in design stages, under environmental review, or under construction:
Anticipated Completion Date
Citywide Traffic Signal Management The project develops and implements a traffic signal monitoring program, signal coordinating master plan, and performs average daily counts citywide. This project is currently in the implementation phase.  Early 2018
Sidewalk Repairs This annual program focuses on repairing damaged existing sidewalks at street and park locations throughout the City. Staff is currently addressing repairs of citywide sidewalk trip hazards. Annual
Street Sign Replacement This project replaces faded street signs citywide in phases until 2018, to meet new compliance requirements of the 2012 California Manual on Uniform Traffic Control Devices. Currently, signs around schools will be updated by June 2015 and citywide by 2018. Summer 2018
Teed Street Storm Drain Improvement The project provides drainage improvements on Teed Street near Vesper Road. The City has contracted with Proactive Engineering for the design phase of the project. The project is expected to start in Fall 2017. Early 2018
Regional Traffic Signal Synchronization (TSSP) Synchronization of traffic signals across multi-jurisdictional boundaries along the remaining three of eight major arterial roadways in the City listed below. Synchronized timing programs have been implemented at the three locations below. The City is preparing to initiate the monitoring and operation phase of the project.  Five of eight major arterials are already completed (refer to Recently Completed list).
1. Alton Parkway                                     
2. Bake Parkway                                       
3. Barranca/Muirlands                               
Early 2018
 Early 2018
 Early 2018
 Early 2018
Village Pond Park This project rehabilitates Village Pond Park with new landscaping, walkways, park amenities, and water quality improvements. The project design reduces the waterfowl population to a more sustainable number while improving the entire park experience.
Access the Village Pond Park webpage for all bids specifications, reports, answers to Frequently Asked Questions, and more.
Mid 2018